Tuggeranong Office Park

TOP 16

Client: Cromwell Property Group
Architect: Nettleton Tribe
Delivery Form: Design & Construct
Location: Tuggeranong, ACT
Value: $180m JV with FDC
Completion date: September 2017

RCC partnered with FDC to deliver a new 8 level commercial office building for the Australian Government Department of Social Services, consisting of:

  • 50,000m2 gross building area
  • 30,500m2 NLA (Nett Lettable Area)
  • One basement level
  • Lower and Ground Levels consisting office areas, building operation, entry, amenities and shared areas
  • 4 upper office areas with amenities and open atrium
  • Roof Level (1) plant room area
  • Temporary car parking and external works

 

Key features of the project include:

  • 5 Star Green Star Design and As-Built Base Build
  • 4 Star Green Star Design and As-Built Fit Out
  • 4.5 Star NABERS rating

Walsh Bay Arts Precinct

external render

Client: Infrastructure NSW
Architect: Tonkin Zulaikha Greer Architects
Delivery Form: Managing Contractor
Location: Dawes Point, NSW
Value: $127m
Completion date: September 2020

The project entails creating a public arts and cultural hub on Sydney’s waterfront, while preserving its former industrial heritage elements. RCC is currently managing the demolition and upgrade of existing arts facilities on Wharf 4 & 5 for the Sydney Dance Company, Bangarra Dance Theatre, Sydney Philharmonia, Gondwana and Song Company; as well as new commercial retail opportunities.

32 Smith Street, Parramatta

32 SMITH ST, GPT REDEVELOPMENT

Client: GPT Group
Architect: Fender Katsalidis Mirams
Delivery Form: Design and Construction
Location: Parramatta, NSW
Value: $139m
Completion date: December 2020

RCC is currently managing the design and construction of a 28 storey, A grade commercial tower in Parramatta.

Set to become a landmark building in the Western Sydney hub of Parramatta, the building will include:

  • Ground floor retail
  • 4 levels of podium car park for 113 vehicles and 132 bicycles
  • Public domain improvements; including two new laneway links known as James Lane to the east and William Lane to the south, and enhancements to Phillip and Smith Streets
  • 19 levels of commercial office space
  • Laneway works.

The building is a Smart building with a vision to create Parramatta’s smartest building that provides a compelling urban response to the surrounding context and is emblematic of Parramatta’s Smart City Vision. It will also integrate Comfy App technology, enabling occupants to take control of their environment via their smartphones.

Oran Park Commercial 1

Render_Page_10

Client: Greenfields Development Company
Architect: Allen Jack & Cottier
Delivery Form: Design and Construction
Location: Oran Park, NSW
Value: $44m
Completion date: December 2019

The project involves the design and construction of a new 6 storey, 30,000m2 distribution centre that incorporates the following key features:

  • 3 Storey Basement Carpark with a total of 320 vehicle spaces and 20 motorcycle spaces
  • 3 Passenger Lifts servicing 9 Levels & 1 Car Lift servicing the roof
  • Landscaped roof-top terrace
  • Associated street level landscaping works; and
  • Dedicated loading / delivery dock area

Airtrunk Data Centre – Huntingwood

Huntingwood Data Centre

Client: Airtrunk
Architect: DEM Australia
Delivery Form: Design and Construct
Location: Huntingtonwood, NSW
Value: $87.8m
Completion date: September 2017

Design and construction of phase one included the delivery of a 12,000sqm data centre facility comprising of a two level data centre which was broken into 8 data halls boosting 20mw of capacity cooled by 20 CRAC (Computer Room Air Conditioning) units per hall (100 in total). The tech building spanning 4,800m2 over 3 stories located adjacent to the main data hall will facilitate all the amenities and tenant areas for current and future use including meeting and communications rooms, and 3 lifts.

165 Phillip Street

165 Phillip Street

Client: Barana Group
Architect: 
Delivery Form: Design & Construct
Location:
Value: $22.5 m
Completion date: July 2017

The 165 Philip Street project involved the refurbishment of an existing commercial building. Works included the alterations and additions to commercial building, including facade restoration works to Phillip Street and Elizabeth Street frontages, internal building upgrades, fit-out of new offices, provision for new retail spaces and restaurants to be fitted out by future tenants.

Khartoum Road Commercial, North Ryde

Goodman-8-Khartom-Maq-Pk-076

Client: Goodman Property Services (Aust) Pty Limited
Architect: Fitzpatrick + Partners
Delivery Form: Design & Construct
Location: North Ryde, NSW
Value: $31.6 m
Completion date: March 2017

This project involves the construction of a Goodman Corporate office building, inclusive of a 5 levels of commercial office space with 11,200m2 of GFA.
Included in the works was:
• 4 carpark basement levels with 11,340m2 GFA including; 251 Car spaces , 12 Motorbike spaces and 98 Bicycle spaces
• 4 passenger /Good lifts servicing 10 levels
• Ground Floor with 2,900m2 GFA including a Gymnasium, Showroom, Coffee Shop, Loading Dock, Service Rooms & Amenities
• Building height of 30m (RL 82.500)

The building achieved 4.5 Star NABERS rating, 4 star Green Star design rating and is a Property Council of Australia Grade A Office Space
The site boasts close proximity to public transport and major roadways, to allow for an accessible commute for employees.

Canberra Metronode Data Centre

Canberra Metronode Data Centre

Client: Metronode Pty Ltd
Architect: Peckvonhartel
Delivery Form: Design & Construct
Location:
Value: $14.4 m
Completion date: September 2015

The Canberra Data Centre is based on the Bladeroom Data Centre design, and is currently under construction. The data centre will be 2 levels, and based around, technical space; permanent work space for asset & security management 8 data halls, plant infrastructure & technical space and climate controlled computer containers.

The Hills Shire Council Relocation

The Hills Shire Council Relocation

Client: The Hills Shire Council
Architect: Suters Architects
Delivery Form: Managing Contractor
Location: Baulkham Hills, NSW
Value: $25.1 m
Completion date: October 2013

This project involves major rectification works from a previous builder. Following this will be the high level fitout and services upgrade.

Our company is responsible for the co-ordination and management of the relocation of The Hills Shire Council members.

Centrelink, Tamworth

Centrelink, Tamworth

Client: Tamdan Developments Pty Ltd
Architect: Team Design Australia
Delivery Form: Design & Construct
Location: Tamworth, NSW
Value: $2.6 m
Completion date: May 2013

Construction of new office facilities for 65 staff from the Australian Department of Health Services, incorporating Centrelink and Medicare offices.