Wentworth Point, Block D Stage 1

Delivery of City Freehold’s Stage 1 of a 4 staged Masterplan for Wentworth Point and the first completed ‘Build to Rent’ Residential Building in Sydney. The site is situated in the up and coming residential estates between the Homebush Bay waterways and the historical Millennium Parklands.

Stage 1 will deliver:

  • 203 Units over 8 stories, and 8 terraces
  • Single level basement
  • 256 car spaces
  • Infrastructure works with over 600m of roads linking Hill Road
  • Foreshore works including a new Sea Wall to Homebush Bay

Client: City Freehold
Architect: Bates Smart
Delivery Form: D&C
Location: Wentworth Point, NSW
Value: $121m
Completion date: June 2023

Kurraba Residences

A unique development of a kind never before seen on Sydney Harbour; the ultra-luxurious Kurraba Residences is a once in a lifetime residential development of this distinction which will become a landmark on the prominent harbour peninsula site at Kurraba Point.

Set within a boutique collection of residences echoing the majesty of Sydney’s grand waterfront estates, the classic and contemporary Kurraba Residences is seamlessly designed to integrate with this phenomenal environment and the established heritage that make Kurraba Point such a special place to live.

This exciting development consists of 24 luxury residences, each one designed with the considerations that one would give to an elite and exclusive private home.

Client: Thirdi Group
Architect: SJB Architects
Delivery Form: DD&C
Location: Kurraba Point, NSW
Value: $43m
Completion date: August 2023

Bloom Arncliffe

Design and construction of a mixed-use development in 7 towers of up to 11 storeys containing:

  • 318 residential units
  • 36 commercial suites
  • Youth centre
  • Associated ball courts
  • Basement car parking for 516 vehicles

The project also involves the construction of a public park including feature paving, turf areas, play areas for the local community.

Architect: EJE Architects
Delivery Form: Design and Construction
Location: Arncliffe, NSW
Value: $136m
Completion date: October 2020

Vantage Residences

Design and Construction of a new apartment building comprising of 4 levels of below ground basement car parking, ground level commercial tenancy and 19 levels of residential (101) apartments.

Client: Platino Properties
Architect: PA Studio
Delivery Form: Design and Construction
Location: North Sydney, NSW
Value: $48m
Completion date: April 2020

Quartet Lane Cove

Luxury residential development in Lane Cove consisting of:

  • 4 Building Towers
  • 233 apartments (studios, 1 beds, 2 beds, 3 beds, penthouses and 2 storey terraces)
  • 6 Ground Floor Entrance Lobbies

The project includes a complex and detailed façade, common landscaped podiums and 2 level basement carpark under the whole site.

Client: Yifang LC Pty Ltd
Architect:  Bates Smart
Delivery Form: Design and Construction
Location: Lane Cove, NSW
Value: $95m
Completion date: Jan 2019

Waterline Cronulla

A seven level waterfront residential project incorporating 27 high end apartments over two levels of basement car parking. Each apartment consists of either two or three bedrooms, with a café and commercial space located on ground level.

Client: JDH Capital
Architect:  Vic Lake Architects
Delivery Form: Design and Construction
Location: Cronulla, NSW
Value: $30m
Completion date: June 2020

Park Sydney

A high-density development consisting of 330 residential apartments across eight buildings over a common basement. The Design and Construct package of 8 buildings includes residential, retail tenancies, mall and childcare, medical centre, mutual basement and new roadways/infrastructure and modifying existing roadways.

The Park Sydney precinct has been classified as one of the biggest urban renewal sites within the City of Sydney and has been the subject of extensive master planning.

Client: Greenland Group
Architect: WMK Architecture
Delivery Form: Design and Construct
Location: Ashmore, NSW
Value: $166m
Completion date: November 2020

Flour Mill of Summer Hill

Design and construction of 233 residential apartments over 5 buildings, commercial and retail spaces, 2 levels of basement carparking and extensive associated landscaping, public space and roadworks.

Stage 3

  • 3 buildings (3 residential + 1 retail cold shell)
  • 135 apartments
  • 35 total level (excl. Basements)
  • 2 basement carpark levels

Stage 4

  • residential building (9 residential levels)
  • 98 apartments
  • 2 basement levels for carpark
  • Access bridge built over Sydney Water stormwater canal

Mungo Scott

  • Commercial / Retail building – adaptive re-use of heritage building
  • 5 levels
  • 790m2 of retail space
  • 2,800m2 of commercial space

Client: EG Funds
Architect: EJE Architecture
Delivery Form: Design & Construct
Location: Summer Hill, NSW
Value: $129m
Completion date: February 2019

Trinity Terraces

Design and construction of 54 x luxury 3 bedroom residential terrace houses with dedicated secure stair access into each terrace. Below each terrace includes a common underground basement carpark for 58 vehicles and 54 individual bicycles storage cages.

Client: Polaris Holdings / First Focus Management
Architect: JPR Architects
Delivery Form: Design & Construct
Location: Rosebery, NSW
Value: $33m
Completion date: November 2018

The Miller

The project generally comprises the demolition of the existing office building, which consists of a ground floor, levels 1 –L13, mezzanine floor to L14, rooftop plant room, and two storeys of basement car park. Construction of a new mixed use apartment building comprising 6 basement levels, 1 ground retail level containing 1 tenancy, and the construction of a 23 storey structure (plus plant room level, roof and 5 levels of basement), which will be a mixed use development of residential units, a retail units and serviced apartment units as follows;

  •  183 Residential Apartments.
  •  100 Serviced Apartments (Quest Hotel)

Client: Yuhu Group
Architect: PTW Architects
Delivery Form: Design & Construct
Location: North Sydney, NSW
Value: $108.6 m
Completion date: February 2019