Tempo Drummoyne

Tempo, Drummoyne consists of the design and construction of 164 apartment units in 6 buildings, across 2 levels of shared basement carpark. The project also includes 3 retail tenancies on the ground floor fronting Church Street and 11 commercial tenancies on the ground floor fronting Victoria Road.

Works included the landscaping of two private open space areas to the rear of the building, encompassing communal gathering areas and a BBQ area for residents to meet with neighbours and other occupants within the building.

Practical completion for Tempo was reached in July of 2018.

Client: EG Funds Management
Architect: FKM Architects
Delivery Form: Design & Construct
Location: Drummoyne, NSW
Value: $61.3m
Completion date: April 2018

Tailors Walk

Construction of 4 buildings, ranging between 3 – 8 storeys containing 377 units and 58 terraces. The project includes publicly open space and basement and ground level car parking for 741 vehicles.

Client: Frasers Property Group
Architect: Group GSA
Delivery Form: Design & Construct
Location: Botany, NSW
Value: $170.1 m
Completion date: April 2018

One A, Coulson Street

174 apartments over 8 levels including 1 basement car park, associated site works and landscaping.

Client: Abacus Property Group
Architect: Kann Finch Group
Delivery Form: Design & Construct
Location: Erksineville, NSW
Value: $70.5 m
Completion date: March 2018

Breakfast Point Residential Development

Richard Crookes Constructions has been working at the Breakfast Point site since 2006. During this time we have been involved in the design and construction of 1,300 apartment buildings in 20 residential stages using a Design and Construct and GMP Lump Sum contract delivery. All stages include multi-storey basement carparking and extensive landscaping. 
With a one team approach from the onset, our Early Contractor Involvement allowed us to mitigate risks, assist in design, provide innovations and resolve any buildability issues.
RCC worked within a fully operating site, managed traffic, and minimised noise and disruptions to the surrounding Breakfast Point community.
The continuous award of stages is a testament to RCC’s focus on delivering high quality apartments on time and within budget.

Client: Rose Property Group
Architect: Rose Architectural Design
Delivery Form: Design & Construct
Location: Breakfast Point, NSW
Value: $430 m
Completion date: January 2018

IGLU Student Accommodation Redfern

Construction of an 18 storey, 370 bed, 134 unit student accommodation facility with communal living spaces on level 1 and retail and community space at ground floor.

The project involves the partial demolition of the existing buildings and retention of the Regent Street façade.

Client: IGLU
Architect: Bates Smart
Delivery Form: Design & Construct
Location: Redfern, NSW
Value: $47m
Completion date: December 2017

Leichhardt Green

Design and construction of 287 apartments across 5 residential tower buildings ranging from 4-9 stories in height. Also includes 5 retail tenancies on the ground floor of building B, 1 ½ levels of basement car parking, 8 lifts serving the 5 buildings with a garbage hoist to transport materials from basement to loading dock

Client: Greenland
Architect: Bates Smart
Delivery Form: Design & Construct
Location: Leichhardt, NSW
Value: $95.4 m
Completion date: February 2018

165 Phillip Street

The 165 Philip Street project involved the alterations and additions to an existing commercial building, including facade restoration works, internal building upgrades, fit-out of new offices, provision for new retail spaces and restaurant spaces.

The works are the refurbishment of the existing building while maintaining an active hotel on Level 6 to Level 9.The existing structure is understood to be constructed from steel and concrete frame .

New entrances were created on both street frontages with steel and glass awnings providing weather protection . The public domain was also upgraded on Phillip Street inclusive of paving works and new lighting. The commercial fitout consists of plasterboard walls with high specification applied finishes to the walls and flooring.

Client: Barana Group
Architect: Smart Design Studio
Delivery Form: Design & Construct
Location: Sydney, NSW
Value: $25m
Completion date: May 2018

Lamond Drive

Construction of 3 residential blocks with a total of 83 apartments.

The project included the demolition of 5 existing dwellings and highly technical excavation and shoring as the site drops approximately 30 metres from street level to the rear of the site.

Client: Ralan Group
Architect: Opra Architects
Delivery Form: Design & Construct
Location: Turramurra, NSW
Value: $27.9 m
Completion date: March 2017

Khartoum Road Commercial, North Ryde

This project involves the construction of a Goodman Corporate office building, inclusive of a 5 levels of commercial office space with 11,200m2 of GFA.
Included in the works was:
• 4 carpark basement levels with 11,340m2 GFA including; 251 Car spaces , 12 Motorbike spaces and 98 Bicycle spaces
• 4 passenger /Good lifts servicing 10 levels
• Ground Floor with 2,900m2 GFA including a Gymnasium, Showroom, Coffee Shop, Loading Dock, Service Rooms & Amenities
• Building height of 30m (RL 82.500)

The building achieved 4.5 Star NABERS rating, 4 star Green Star design rating and is a Property Council of Australia Grade A Office Space
The site boasts close proximity to public transport and major roadways, to allow for an accessible commute for employees.

Client: Goodman Property Services (Aust) Pty Limited
Architect: Fitzpatrick + Partners
Delivery Form: Design & Construct
Location: North Ryde, NSW
Value: $32m
Completion date: March 2017

Discovery Point Stage 2 – Greenbank and Verge Apartments

The Greenbank and Verge Apartments at Discovery Point in Sydney’s Arncliffe was the construction of two 11 storey buildings comprising a total of 223 apartments. Greenbank consists of 135 residential apartments within an 11 storey building over three levels of basement car parking. Verge was also 11 storeys, including 3 levels of basement car parking, and consists of 88 apartments with commercial and retail areas at the podium levels. Verge adjoins Greenbank and includes two swimming pools and a gymnasium.

Architectural features of the development include feature FC walls, sun louvres and shades, tiled balconies and curved buildings. Greenbank was integrated with a heritage building at the base of Mt. Olympus and required the use of old flag stones.

Our company is now building another 88 apartments at the Discovery Point site. This stage is referred to as Linc Apartments.

Client: Discovery Point (Australand
Architect: Cox Richardson
Delivery Form: Construct Only
Location: Wolli Creek, NSW
Value: $28.1 m
Completion date: December 2006