Hillsong Epicentre

The multilevel facility was built within an existing precinct which comprised educational college facilities. Works included the expansion of the college and new state-of-the-art performing arts facilities comprising of a new 600 seat auditorium, associated back of stage facilities, multiple studios, musician and band rooms.

The building also includes a commercial grade television studio and sound recording studio. Additional works included construction of a 3-level underground carpark.

The Epicentre is Australia’s head office and operates round the clock 7 days a week. In 2018, the Epicentre won the Master
Builders Associations Excellence in Construction Award for Tertiary Building over $30m.

Client: Hills Christian Centre Limited
Architect: NBRS Partners
Delivery Form: Managing Contractor
Location: Baulkham Hills
Value: $35m
Completion date: February 2017

Oran Park Metro Apartments

Metro Apartments 1 is Oran Park’s first residential apartment complex, a significant milestone for the area. The development resides among a mixed-use precinct including twin commercial buildings, the first of which was successfully delivered by RCC in early 2020.

The design and construction of this much anticipated project offers six levels of residential space accommodating 53 apartments with a mix of one, two and three-bedroom apartments. The residential building forms part of a a pedestrian friendly precinct, where built form has a human scale at street level, with cultural and civic expression.

Client: Greenfields Development Company
Architect: Allen Jack & Cottier
Delivery Form: Design and Construction
Location: Oran Park, NSW
Value: $19m
Completion date: June 2022

Galungara Primary School

The construction of Galungara Primary School is a component of School Infrastructure NSW Pilot Program to deliver permanent schools across NSW in response to projected growth in student population.

Galungara Primary School consists of:

  • 55 Prefabricated Modules
  • 19 flexible learning spaces, including specialist learning spaces
  • Accommodate up to 500 students
  • New administrative and staff facilities
  • New Hall
  • New Library
  • New covered outdoor learning area (COLA)
  • Canteen and External Works
  • Landscaping and Site Infrastructure

The school has been designed to extend student capacity to up to 1000 students in the future with installation of modular ‘Stage 2’.

Client: School Infrastructure
Architect: Group GSA
Delivery Form: DD&C
Location: Schofields, NSW
Value: $43m
Completion date: February 2021

Cranbrook School Stage 2 Redevelopment

The Cranbrook School’s Stage 2 Redevelopment of the northern portion of their Senior School Campus consists of the construction of the new Vicars Centenary Building that will provide approximately 6,258sqm of new purposefully designed teaching and learning environments, including: teaching and learning spaces, teaching terraces, a drama theatre, a dining commons, a place of worship and an assembly hall.

Construction also includes the new Murray Rose Aquatic and Fitness Centre constructed beneath the existing Hordern Oval, comprising of 50m swimming pool, 25m Learn to Swim pool, multi-purpose sports hall, gymnasium, and 126 space carpark.

Client: Cranbrook School
Architect: Architectus
Delivery Form: Design & Construction
Location: Bellevue Hill, NSW
Value: $125m
Completion date: 2022

UTS Central

RCC partnered with the University and FJMT under a Managing Contractor agreement we could progress the concept design without delaying the construction of the project. This process allowed RCC to actively contribute to the design and value management in real time.

The works involved the demolition of the existing building and the construction of a new teaching building, including a new UTS Library, Faculty of Engineering, learning commons and research labs. The building presents as an undulating semitransparent building wrapping the base of the tower, this is achieved with curved glass façade.

Since starting on site, $63m (25%) additional scope has been added to the scope of works, including super lab fitout, feature stairs and fitout of the tower.

Client: University of Technology Sydney
Architect: FJMT
Delivery Form: Managing Contractor
Location: Ultimo, NSW
Value: $307m
Completion date: August 2019

University of Wollongong Molecular & Life Sciences Building

Design and construction of a Molecular and Life Sciences building up to five storeys at the University of Wollongong, Wollongong campus, comprising of:

  • Site excavation and establishment works;
  • Office and administration areas;
  • meeting and conference rooms;
  • Research and chemistry laboratories;
  • Animal house;
  • Astronomy and chemistry roof platform with rooftop mechanical plant.

The MLS project also consists of the:

  • Construction of single pedestrian bridge between the MLS building and the adjoining IHMRI (building 32);
  • Reconfiguration of the eastern portion of existing P7 car parking to accommodate 13 accessible car parking spaces; Construction and augmentation of associated infrastructure services including a stormwater management, electricity substation and telecommunications;
  • Landscape and public domain works including leaning spaces, gathering spaces, gardens and the planting of new vegetation including 12 advanced plants and accessible paths; and
  • Installation of building identification signage, on the eastern and western facades of the lit overrun.

Client: University of Wollongong
Architect: Jacobs Engineering Sydney
Delivery Form: D&C
Location: Wollongong, NSW
Value: $57m
Completion date: January 2020

Jordan Springs Public School

The construction of Jordan Springs Public School is a component of the School Infrastructure NSW Pilot Program to deliver permanent schools across NSW in response to projected growth in student population.

The Jordan Springs Public School consists of:

  • 64 Prefabricated Modules
  • 27 flexible learning spaces, including specialist learning spaces for up to 600 students;
  • Library with Timber Amphitheatre Seating and Hall Space;
  • Administrative and staff facilities;
  • Covered outdoor learning areas (COLAs);
  • Canteen and External Works;
  • Landscaping and Site Infrastructure

Client: School Infrastructure NSW
Architect: Group GSA
Delivery Form: DD&C
Location: Jordan Springs, NSW
Value: $46m
Operational From: July 2020

Alexandria Park Community School

The redevelopment of Alexandria Park Community School will involve the demolition of the existing school and construction of a new school suitable for 1,000 primary and 1,200 secondary students.

The new construction will include:

  • Multiple school buildings up to 5 storeys, including classroom home bases, collaborative and specialists learning spaces/hubs and learning support spaces, offices for teachers and administration staff, a sports hall, library, and student canteen.
  • Construction of 2 outdoor sports courts and an all-weather, all-purpose synthetic sports field.
  • Construction of informal play spaces and a Covered Outdoor Learning Space (COLA).
  • Site landscaping including green links, community garden, open space areas and rooftop play spaces.
  • On-site car parking and associated vehicular access point off Belmont Street.
  • Ancillary infrastructure and utilities.

Client: NSW Department of Education
Architect: Tanner Kibble Denton (TKD)
Delivery Form: Design and Construct
Location: Alexandria, NSW
Value: $103m
Completion date: December 2021

Sirius Building

The Sirius Building was originally designed in the 1970s and built in the 1980s for social housing. JDH Capital, Dedico and BVN Architecture’s partnership will revitalise the iconic land-mark while protecting its rich heritage offering high-end, luxury living and an exciting Sydney lifestyle opportunity.

Key features includes:

  • 76 high-end apartments with spectacular 360 degree Sydney Harbour views
  • Three SOHO (small office home office) units
  • Separate building featuring a pool and cafe
  • Several pools for rooftop apartments
  • Delivery of a laneway cafe
  • Copper facades
  • Revitalised heritage common area – Philip Room

Client: JDH Capital
Architect: BVN
Delivery Form: ECI + Design & Construction
Location: Sydney, NSW

Quay Quarter Lanes

This project involves the design and construction of a mixed-use development comprising three new residential buildings (106 units) with a retail precinct, commercial space, basement car parking, refurbished heritage buildings, Gallipoli Memorial Club (Building G) and Hinchcliff House (Building H) and certain Public Domain Works.

Client: AMP Capital Investors
Architect: Studio Bright, Silvester Fuller, SJB Architects
Delivery Form: Design and Construction
Location: Sydney, NSW
Value: $200m
Completion date: April 2021