Gosford Hospital Health & Wellbeing Precinct

Health

Hunter

Delivered across three separate stages, these works comprised D&C delivery of a multi-level carpark, base build of a six-storey tower on top, and fit-out of the UoN Central Coast Clinical School and Research Institute (CCCSRI). RCC worked closely with Health Infrastructure NSW and the Central Coast Local Health District, also the University of Newcastle as our client for the fit-out portion of works.

  • Car Park: 803 spaces and drop off zone, situated on 11,748m² site with a 23% gradient
  • Tower A Base Build: A concrete structure, glazed curtain wall façade system, void within floor plate to accommodate future three-level staircase, and podium terrace extension.
  • CCCSRI Fit Out: Comprising 7,250m² net lettable area across six storeys from level 6 to level 11, including design coordination with Health Infrastructure and University of Newcastle, and installation of supplementary services.

Client: Health Infrastructure NSW and University of Newcastle
Architects: Fitzpatrick + Partners, and Design Inc
Delivery Form: Design & Construction
Location: Gosford, NSW
Value: $79m (including $21m fitout)
Completion date: Stage 1 – December 2018, Stage 2 – June 2020, Stage 3 – June 2021